Monday, March 19, 2012

Painting





We've done the first two coats of paint on the interior, (these photos were taken after the first coat.) Now we're going to put up all of the trim on the walls and ceiling, and make the window piners before putting a final coat of paint on.

Wednesday, March 14, 2012

Changes




The interior walls are all lined, including the end bulkheads. We've started constructing the internal bulkheads today, and these will create the bathroom space.

Wednesday, March 7, 2012

Subfloor


The subfloor is made up of 16 sheets of 18mm ply.

Bubblewrap




We're putting double shell silver backed bubblewrap underneath the subfloor. Just started on that today.

Saturday, March 3, 2012

Interior lining


We have just started lining out the interior walls. These are being sheeted with 12mm ply which will be painted. (43 sheets.)

Roof furniture




The roof vents are all temporarily in place, we've drilled and tapped the roof and attached them, but they can be removed for painting.

The ceiling is finished




We finished the ceiling the middle of last week. It has a total of 24 12 volt lights and two additional deck light (prisms) which are going to look amazing on a sunny day. We will clad the interior with a painted box.